Tasuta kohaletoimetamine tellimustel üle 150,00 $
|
trustpilot white startrustpilot white startrustpilot white startrustpilot white startrustpilot white starTrustscore 4.8 based on 30831 reviews
|
Speedy Dispatch 1-2 Business Days
Top
Liigendnuga Böker Magnum Long Lead EDC 01SC080Liigendnuga Böker Magnum Long Lead EDC 01SC080

Liigendnuga Böker Magnum Long Lead EDC 01SC080

27,96 $

Ships to:

USA

Tootja :

Kaup:

Long Lead EDC

Kauba nr:

01SC080
Information about delivery
The product availability information is always up to date.

Special order
+ "Delivery time xx - xx business days". We do not stock this product. However, you can place an order we will deliver it within the given time frame.
+ "Delivery time is temporarily unknown". We do not stock this product, and the product is not currently available for order. You can sign up for an availability notification by clicking "Notify when in stock".

Eritellimus. Tarneaeg 7-14 tööpäevad
Lisage korvi!
Lisa soovikorvi
Võrrelge

Miks meilt tellida?

Tasuta kohaletoimetamine tellimustel üle 150,00 $

Kiire lähetamine 1–2 tööpäeva jooksul

14-päevane tagastus

Information about delivery
Meelt võib muuta! Kasutamata toote võib tagastada originaalpakendis 14 päeva jooksul. Võite tagastada toote või saada tagasimakse. Teile tagastatakse kauba, tarnele ja maksude (kui on kohaldatav) peale kulunud raha, ent meile tagasitarnele ja käsitsemise kulusid ei tagastata.

EELDATAV TARNEAEG

Tarneviis:

HIND KOKKU

Hind:

27,96 $

Tarnimine:

21,86 $
Tasuta kohaletoimetamiseks vajalikust summast puudub 122,04 $!

Kokku USD:

49,82 $*

Kokku EUR:

45,29 €

* Arve esitame eurodes. Teie pank arveldab valuuta vastavalt oma kursile ümber. Lõppsumma võib eeldatavast summast erineda.

Miks meilt tellida?

Tasuta tarne
Kiire tarne
Klienditeenindus
Turvaline ostlemine
Tagastamisõigus

Tehnilised andmed

Kauba nr

01SC080

Tera

8Cr13MoV

Lukustusmehhanism

Slip joint

Avamismehhanism

Küünesälk

Käepide

Micarta

Kaal:

2.751 oz

Kogupikkus:

7.24″

Tera pikkus:

3.15″

Pikkus terata:

4.09″

Tera paksus:

0.11″

Muud andmed

Taskuklamber

Kategooriad

EDC taskunoad

Recommended products

Lamnia's green values

Logistics

Logistics

Emissions compensation

Packaging

Packaging

Greener use of materials

Energy

Energy

Sources from the nature

Waste utilization

Waste utilization

Because it's simple yet important

Lamnia

Lamnia spetsialiteediks on muljetavaldav noavalik, mis koosneb enam kui 5000 noast ja taskunoast. Meie tootevalikust leiate sadu Soome Puukko nuge, taskunuge, jahinuge ja köögiriistu maailma parimatelt kaubamärkidelt nagu näiteks Spyderco, Böker, Roselli, Fox Cutlery ja Cold Steel.